We first worked with Lumieredesoso in 2022, when they replaced the metal-halide fixtures in our main assembly hall at the Sibu shipyard. That job ran smoothly, so when we expanded our storage wing last year, we went back to them without shopping around.
What stood out this time was how little hand-holding the project needed. The site survey was done in two days, and the lighting layout they proposed matched our racking plan almost exactly. We only had to move two fixture rows to avoid a new conveyor line that was added after the initial drawings.
The installation crew worked overnight shifts so we could keep receiving containers during the day. They finished three days ahead of schedule, and the only disruption was a brief power cut on the second night while they swapped the main distribution board.
Six months in, the energy readings are close to what they projected. Our monthly lighting consumption for the new wing is about 38% lower than the old section of the same size, and we have not replaced a single driver or module since commissioning. The automated dimming responds well to daylight, though we did have to adjust the sensor thresholds twice to stop it flickering near the loading docks.
Would we call them again for the next phase? Yes. The follow-up support has been responsive, and they still remember the specifics of our site when we call. That continuity matters more than a discount.